Cool Systems Installation Group Air Conditioning Logo
Chillers on roof of building

CASE STUDY 1

 










head office HVAC CS Group Tel. Number



Internal escalator in wide space office building
 

Air Conditioning Companies Logos Mitsubishi Air Conditioning Toshiba Air Conditioning Panasonic Air conditioning Fujitsu Air Conditioning Hitachi Air Conditioning Daikin Air Conditioning
VENUE:  DEXTER HOUSE EC1

Refurbishment of the first floor level at the well known Dexter House London EC1 for ECT Venues: CS Group introduce the design and installation of energy saving inverter controlled heat recovery air conditioning along side heat recovery ventilation equipment working as supplementary air conditioning along side an existing building VAV type system.


PLANNING:Dexter House London EC1 - ECT Venues

When ECT Venues choose Dexter House as one of their prestigious training facilities they knew that there would be problems with temperatures in the summer months due to the high level of occupancy.

The building had a fully functional ducted VAV type system that introduced conditioned air onto the perimeter of each floor throughout the building; although this is an effective type system it was not capable of handling the heat loads from the high level of occupants and a supplementary system was required that could be interfaced with the existing system, but would not require any additional works when the seven year lease expired.

SITE SURVEY:

CS Group™surveying team attended site upon instructions from our client (Wagstaff Interiors) where we carried out a full site survey for the design and installation of a heat recovery system.  We generated computer aided heat and loss gain calculations and designed a system that would deliver optimum cooling and heating performance.

Dexter House London EC1 - ECT Venues 3NO Daikin inverter heat recovery systems on roof RECOMMENDATIONS:

We then offered 3 viable options for the project and pointed out the benefits and shortfalls of the different budget costs presented.  The client was conscience of the initial expenditure outlay of the project, but was also very concerned about the general running costs.

CS Group™ proposed recommendations for inverter driven heat recovery systems would save them around 50% on their power consumption usage, thus reducing their initial energy expenses.  Also the selected equipment would fit in with their existing VAV ducted type system.

INSTALLATION:

All communications with the client and various other contractors were coordinated prior to starting by the CS Group™ Project Manager.  This ensured that there were no conflicts with the main contractors planned work schedule and that the training facility could open in the given time.
HRV Installed, inside view of Dexter House, London EC1 - ECT Venues
CS GROUP™ subsequently designed and installed 3NO Daikin inverter heat recovery systems with additional heat recovery ventilation units operating on R410a refrigerant.

A supervisor from CS Group™ attended the site regularly and attended weekly site meetings during the installation.

COMMISSIONING:

CS GROUP™ dealt with issues that arose and made certain the job went like clockwork.

Our commissioning engineers carried full testing and diagnostics procedures to the newly installed equipment. All tests were documented, recorded and then formed as part of the 5 year parts warranty. They made good any snagging defects ahead of handing over for completion dates.

We then appointed one of our fully trained supervisors prior to the opening for business to demonstrate the operation of the equipment to the staff and issued the client with three in-depth operation and maintenance manuals for the final handover.
HRV Installed, internal view of Dexter House, London EC1 - ECT Venues HRV Installed, hallway view inside Dexter House, London EC1 - ECT Venues HRV Installed, window view inside Dexter House, London EC1 - ECT Venues
CS Group offer full range of HVAC solutions for Commercial, Industrial, Retail and Domestic Clients


Air Conditioning Installations | HVAC installers | Cool Stream Ventilation Installation | Split Air conditioners | Under Floor Heating | Heat Pumps | Heat Pumps Installed | Chillers Installed | Air Conditioning Upgrades | Air Conditioning London & Essex UK | Installations | Air Conditioning Upgrades | Cool Stream Ventilation | HVAC System Upgrades | Refrigerant Replacement | Chillers | HVAC Upgrades to Current Legislation Requirements


Privacy | Sitemap.htm |Sitemap.xml